Width Length
26th St. – Detroit to Gary 20 825
28th St. – West Chicago to Gary 20 800
West Chicago – 27th to 28th Streets 20 800
32nd St. – Canal to Seattle 20 975
34th St. – Canal to Seattle 20 975
Seattle Ave. – 18th St. to Dead End 20 950
Gary Ave. – 15th St. to Dead End 20 280
Elgin Ave – 15th to 17th Streets 20 1,000
Boston Ave. – 21st St. to Dead End 20 1,400
10th St. – Boston Ave to Helena 20 1,850
8th St. – Nederland Ave to Boston Ave 20 700
4th St. – Boston Ave to Dead End 20 525
Marshall – 15th to 12th Streets 20 1,575
Ave K – South 14th St. to Hwy 347 �� 20 1,000
Ave B – South 21st St. to South 20th St. 20 330
Ave G – South 21st St. to Dead End 20 525
Ave B – South 32nd St. to South 37th 20 1,800
South 29th St. – Ave H to Ave G 20 285
South 37th St. – Hwy 365 to Park 20 1,500
Avenue E – South 21st to South 27th Streets 20 1,950
South 6th St. – Nederland Ave to DD7 ditch 20 1,350
West Chicago – 28th St. to Gary 20 650
Total Lf 22,045
City of Groves streets to be repaired in conjunction with Jefferson County Precinct 2:
Reconstruct streets:
Groves Ave. 1,273 feet
Short St. 660 feet
Winona St. 320 feet
Kennedy Lane 346 feet
Montrose Ave. 1,138 feet
Karen Ave. 955 feet
Total feet 4,692
Seal coat streets:
25th Taft Ave. to Hwy. 73 2,641 feet
Anselmo Ave. 1,314 feet
Van Buren Blvd. 1,600 feet
Washington Blvd. 3,439
Oak Ave. 2,645 feet
Total feet 11,639
Terrace extension 200 feet total
200 feet – materials
A-1 base- 200 tons
Two pallets of lime- 100 bags millings
Hogaboom Huntsman project total 150 feet
Drainage and street materials 150 feet 15-inch culvert
Bands and tees total two tees- six bands
Cement stabilize limestone
Two pallets lime 100 bags
A-1 limestone base 200 tons
HP cold mix asphalt 100 tons
Total A-1 base 600 tons $15,330
Cement slab limestone 200 tons $8,600
Lime four pallets $2,098
Prime oil AEP 3,000 gallons $10,650
CRS 2 rocking oil 30,000 gallons $48,000
PB-4 street rock 800 tons $51,200
HP cold mix asphalt 150 tons $15,000
Drainage materials cost $2,800
Total feet 16,331 feet
Total estimated cost street program and Huntsman project and Terrace Extension project $153,678